Track day next Wednesday and of course I've left everything to the last minute in true Todd fashion.
List of jobs that need doing
-Engine comp and leak down tests
-AP2 valve retainers/cotters fitted
-Valve adjustment
-Sump off and cleaned
-Moroso sump baffle welded in
-Buy fitting to replace pcv for catch can
-Buy new tubing for catch can
-Drill holes in top of catch can to vent
-Space bonnet and remove rubber strip
-New voltex wing holes drilled into boot lid
-ASM duckbill sprayed and fitted to boot lid
-Make hood prop
-Tpms fitted to ce28n
-Alignment (uk spec?)
-Oil filter and oil change
-Check over suspension bolts/tighten etc
Yep it's going to be a busy week
List of jobs that need doing
-Engine comp and leak down tests
-AP2 valve retainers/cotters fitted
-Valve adjustment
-Sump off and cleaned
-Moroso sump baffle welded in
-Buy fitting to replace pcv for catch can
-Buy new tubing for catch can
-Drill holes in top of catch can to vent
-Space bonnet and remove rubber strip
-New voltex wing holes drilled into boot lid
-ASM duckbill sprayed and fitted to boot lid
-Make hood prop
-Tpms fitted to ce28n
-Alignment (uk spec?)
-Oil filter and oil change
-Check over suspension bolts/tighten etc
Yep it's going to be a busy week
Comment